- Homepage
- /
- News & events
- /
- Tag: Smart Factory
Tag: Smart Factory
Webinar | Visual Components & OLP: New Features, Workflows and AI Integration | June 11, 2026
Explore the latest features, tools, and workflows introduced in releases 5.0 and 5.1 for manufacturing simulation, Virtual Commissioning, offline robot programming, and production system automation.
Flexcon at SPS Italia 2026: 3D Simulation, AI and Virtual Commissioning | May 4, 2026
Flexcon at SPS Italia 2026: 3D simulation, energy analysis, virtual commissioning and AI integration for industrial process optimization. Meet us in Parma from May 26 to 28.
Events | Simulation Event Kuka & Visual Components 2026 | April 23, 2026
Flexcon participates as an official sponsor at the Simulation Event by KUKA and Visual Components 2026, focused on industrial simulation, Digital Twin and Virtual Commissioning.
Insights | Digital Twin and Digital Factory Compared: Definitions and Applications in Production Systems | March 3, 2026
Digital Twin and Digital Factory are often confused. This article clarifies their definitions, functional differences and the role of simulation in industrial systems.
Webinar | Offline Robot Programming: Efficiency, Flexibility, and Validation with Visual Components OLP | November 12, 2025
Webinar on offline robot programming and 3D simulation with Visual Components OLP.
Use Case | Optimization of Assembly Lines with 3D Simulation | July 17, 2025
Use case: 3D simulation to optimize KONE’s new assembly line for elevator control panels, improving flows, quality, and production continuity.
Insights | Digital twin vs digital shadow vs digital model: key differences explained | February 12, 2025
What’s the difference between a digital twin, a digital shadow, and a digital model? Let’s explore how these technologies work and why the digital twin is essential for optimizing manufacturing production.